
2014 Klemm 709-2
- Manufacturer: Klemm
- Hours: 4,547 h
4547 Working hours Klemm KH43 rotary head (33,000Nm) Tier 3b engine DPF filter Side controls Mast length 8m Max rod length 6m Max torque 35.6kNm Max drill speed 124rpm Hollow shaft 105mm
Middlesbrough, United Kingdom
2018 Klemm 709-2
- Manufacturer: Klemm
- Hours: 6,321 h
CFA & SFA mini piling rig with 6312 working hours Deutz tier 3A engine Feed/retraction force 130kN Mast/stroke length 10,000mm/8000mm Max depth/diameter CFA 8m/600mm Max depth SFA 30m CE marked
Middlesbrough, United Kingdom
2016 Klemm 709-2
- Manufacturer: Klemm
- Hours: 8,104 h
CFA & SFA mini piling rig with 8,104 working hours Deutz tier 3A engine Feed/retraction force 130kN Mast/stroke length 10,000mm/8000mm Max depth/diameter CFA 8m/600mm Max depth SFA 30m CE marked
Middlesbrough, United Kingdom
2014 Klemm KR708-2
- Manufacturer: Klemm
- Model: KR708-2
- Hours: 1,690 h
Mini Piling Rig 1690 working hours Set up for section flight auger piling Klemm KH22 rotary head Length 6500mm Feed/retraction force 60kN/60kN CAT C4.4 DIT engine Rated output 74.5kW EU stage 3A
Middlesbrough, United Kingdom
2008 Klemm KR702-2
- Manufacturer: Klemm
- Model: KR702-2
- Hours: 4,101 h
4101 working hours Sectional flight auger piling 25m max depth 300-450mm dia Deutz TCD 2012 L042V Tier 3a engine
Middlesbrough, United Kingdom
2016 Klemm 806-5G
- Manufacturer: Klemm
- Hours: 3,936 h
Crawler drilling rig 3936 hours KH22/ KH21 Rotary head 180 Kw Tier 4 Final Engine Casing Crane Gamma Pump 8L Automatic Oiler Cathead with 1 tonne winch assembly
Middlesbrough, United Kingdom
2009 Klemm KR712-1
- Manufacturer: Klemm
- Hours: 9,600 h
9600 Hours Comes with: Gamma 202/242 water pump 2 inch hoses for air inlet with hydraulic valve Extending tracks 2500mm - 3700mm Hydraulic operating panel Single hydraulic centering guide/key clamp for 139.7 - 40...
Middlesbrough, United Kingdom
2017 Klemm KR702-2R
- Manufacturer: Klemm
- Hours: 3,552 h
Mini piling rig with 3552 working hours Ideal for mini piling in confined spaces KH22 rotary head Max torque 24.4kNm Max drill speed 203 rpm 102mm dia hollow shaft Feed force 38kN Retraction force 60kN Separate p...
Middlesbrough, United Kingdom
2016 Klemm KR 702-2R
- Manufacturer: Klemm
- Hours: 2,537 h
Restricted access drilling rig with 2537 working hours Klemm KD1011 hydraulic drifter Max torque 11kNm Max speed 362rpm Mast length 2370mm Separate power pack PP115F CE certified
Middlesbrough, United Kingdom
2002 Klemm KR 702
- Manufacturer: Klemm
Mini piling rig for SFA piling PP 117G power pack (2017, 2011 working hours) Max diameter 450,mm Max torque 88kNm Max stroke 2500mm CAT engine in power pack CE certified
Middlesbrough, United Kingdom
2014 Klemm 709-2
- Manufacturer: Klemm
- Hours: 4,547 h
4547 Working hours Klemm KH43 rotary head (33,000Nm) Tier 3b engine DPF filter Side controls
Middlesbrough, United Kingdom
2000 Klemm 802-1
- Manufacturer: Klemm
- Model: 802-1
- Hours: 6,100 h
6100 working hours 2010 Klemm KD 1011 hydraulic drifter Piston weight 11.5kg Max flow rate 90l/min Blow frequency 2800bpm Single blow energy 400Nm) Double hydraulic clamps (max opening 254mm) 3500mm stroke Perkin...
Middlesbrough, United Kingdom
2014 Klemm 709-2
- Manufacturer: Klemm
- Hours: 4,797 h
CFA & SFA 4797 working hours Deutz tier 3 engine Feed/retraction force 130kN Mast/stroke length 10,000mm/8000mm Max depth/diameter CFA 8m/600mm Max depth SFA 30m
Middlesbrough, United Kingdom
2015 Klemm KR 801-3F
- Manufacturer: Klemm
- Hours: 1,952 h
- Max. torque: 11 kNm
Mini piling and anchoring rig with 1,952 hours Deutz TCD 4.1 L4 engine 115kW
Middlesbrough, United Kingdom
2013 Klemm KR702-2R
- Manufacturer: Klemm
- Hours: 4,315 h
4351 working hours Mast length 2200-3200mm Feed length 1200-2200mm Feed/retraction force 38/60kN Sectional flight auger piling 25m max depth, 300-450mm dia Tier 3A engine CE marked KH22 rotary head with motors ty...
Middlesbrough, United Kingdom

